Boundary Bay Project Time Lapse Video

We are excited to share with you a time lapse video forwarded to us by our long standing client Dayhu Group of Companies. Construction of this project started in May 2013 and was completed in February 2016 totaling nearly 880,000 SF. After the completion of Phase I, we moved to construct Phase II. There are 88 dock height loading positions with 4 drive in ramp positions. Clear heights for the warehouse are 36'. As with Phase I, optimal design for the plumbing, HVAC, electrical and fire protection was constructed to ensure energy efficiency. The Boundary Bay Industrial Park is located in Delta, BC.

To virtually watch this project being built click the link below!

https://vimeo.com/192032206